- Galley AGA Stove
- Dining Salon
- Salon Forward
- underway!
- underway!
- fo’c’sle
- bollards installed, temp hatch
- more ports
- more ports
- Ports installed
- Clean Deck
- Bollards going back on deck
- Tom Matzen comes for a visit
- cleaning up welds
- getting ready to paint under the stainless chain bin
- Bollard Placement
- Insert getting dressed
- welding on rivets (top empty)
- close up rivet welding test
- stainless steel caprails and deck on bow, will be covered with teak
- Bow
- Thruster going in
- 16″ Thruster Tunnel
- SS chain bin completed and set in place
- Chain Bin (holds 1000 feet of 11/16 Chain)
- welding up the new plate
- Stb Straightening
- Stb 2nd pass of bulwarks straightening
- Port 2nd pass of bulwarks straightening
- result of first pass of bulwarks straightening
- Removed port light
- Replacing WTB against frw main fuel tanks
- Polished port light
- Port light in process of polishing
- Deck Plate Plate Down
- Deck Plate Plate Down
- Deck Plate tacked in looking aft
- Keeping the Hull Shape around inserts (grey steel)
- Hull straightening with jacks
- hull straightening with jacks
- Deck Plate tacked in looking forward
- Deck Plate tacked in
- Hull straighening
- Dogging in the hull plate
- Dogging in 5/16th ABS garboard hull plate
- Pad eye and the chain hoist
- deck plate!
- primed deck beams
- primed
- sandblasting
- primer going on
- primer going on in bilge
- Dogging in new frames, plate behind here will be replaced next
- Wasted frames and floor
- Wasted floors
- Plate removed! Won’t float or fly
- sparks!
- tearing away plate
- Inserts above waterline
- Starboard bow straightening
- Looking aft
- Looking down into crash bulkhead
- new floors and temporary bracing in forepeak bilge
- new frames in chain locker
- more inserts
- Inserts around portholes
- New deck beams going in
- Fifer March 26th 1947
- Launching 3
- Launching 2
- Launching
- Captain Wyborn
- Inboard Profile and Cabin Sole
- Overall and Rigging Plan
- Master Stateroom coming out
- Concrete in the bilge
- sunlight
- Carron Portlight
- Portlight
- Doghouse
- Doghouse removed
- Stern
- Bow
- sitting pretty at Bayside
- almost out
- Up the ways
- Cap’t Tom calling some shots
- Bayside Wynn and Dan
- foredeck coming out
- Nancy from doghouse
- top down
- Slot to slide in new tank top steel
- Old Top Cut Out
- Port Main Fuel Tank Top Replacement
- Master Stateroom looking forward
- STB Main Fuel Tank Top Replacement
- Master Stateroom Refit
- ph: christine modlin 2013
- america’s cup 2013
- ph: dan levin 2012
- golden gate bridge 75th
- golden gate bridge 75th
- oakland piers
- opening day
- international orange
- sf bay
- sf waterfront
- ph: dan levin 2012
- ph: dan levin 2012
- ph: dan levin 2012
- ph: dan levin 2012
- ph: dan levin 2012
- ph: dan levin 2012
- ph: dan levin 2012